INSTRUCTIONS: GAS OUTLETS WITH MAINTENANCE VALVE, EXPOSED
GCE CENTRAL GAS SYSTEMS
EN
1/4
1. CONDITIONS
The valve body is already carefully aligned and fixed on the wall. The piece of copper tube in the valve body
is brazed to the proper service line and the joint is tested for leaks.
2. ASSEMBLY
Keep all equipment, also hands, tools and working clothes free from grease or oil.
• Unscrew the tightening plug. Insert the PA gasket (2) in the valve body (1).
• Check the engraved letter on the maintenance valve (3): O = Oxygen; N = Nitrous; A = Air
• Screw the maintenance valve into the valve body. Use tool No. 202 200 514 (torque 12 Nm).
• Insert the O-ring (4) in the slot of the valve case (6) and screw the coupling fully into the valve body (1).
• Then turn the valve case until the locking slot is exactly plumb over the coupling centre line. Secure the
valve case in the is position with the locking nipple (5).
• Use a 24 mm spanner or special tool 202 200 513, (torque 15 Nm).
• Test the connection for leaks.
• Fasten the chin of the dust plug (10) to the cover by means of the loop.
• Fasten the name plate by means of the two screws (9) and tighten the cover against the wall.
• Place the sleeve (11) on the valve case and lock it with the circlip (12).
• Test the function of the assembled gas outlets by connecting a male quick coupling for the correct gas.
• Reject enclosed details intended for recessed outlets.
MC 6531=325 195 531 Oxygen / Andningsoxygen
MC 6532=325 196 532 Nitrous Oxide / Lustgas
MC 6533=325 196 533 Air/Andningsluft
MC 6534=325 196 534 Vacuum/Vakuum
MC 6535=325 196 535 Gasoutlet/Gasutlopp
MC 1531=325 191 531 Oxygen/Happi, SF
MC 1532=325 191 532 Lustgas/Dityppioksidi, SF
MC 1533=325 191 533 Andningsluft/Ilma, SF
MC 1534=325 191 534 Vacuum/Tyhjö, SF
MC 1535=325 191 535 Gasutlopp/Kaasujen Poisto, SF
Manufacturer:
GCE s.r.o.
Žižkova 381, 583 01 Chotěboř, Česká republika
http://www.gcegroup.com